Reports · Aug 25, 2026

    Eurasian rail: wider gates in the east, one door in the west

    China–Europe rail traffic through Kazakhstan, Russia and Belarus grew fast in 2026. Kazakhstan is adding capacity at the Chinese border, while the western exit still runs through one Polish crossing.

    Expansive view of cargo trains at Hamburg's bustling rail terminal.
    Wolfgang Weiser / Pexels
    Contents

    Key takeaways

    • ERAI reported that China–Europe–China rail container volume rose 28 per cent year on year in January–May 2026, with the Central Eurasian Corridor growing 27 per cent.
    • Kazakhstan–China rail freight reached 18.7 million tonnes in the first half of 2026, up 9 per cent, with Dostyk up 15 per cent and Altynkol up 2 per cent.
    • The China–Kyrgyzstan–Uzbekistan line has 29 tunnels totalling 104.83 km, and officials aimed to have 5 per cent of it built by the end of 2026.
    • Poland’s 13-day closure of the Belarus border in September 2025 stranded more than 130 trains at Brest and raised transit times to Małaszewicze from two to four days to 20 days.

    Eurasian rail had a strong first half of 2026, and almost none of the new traffic went where Europe’s strategy documents say it should. It went through Kazakhstan, Russia and Belarus, and it entered the European Union at one Polish border crossing. Kazakhstan is widening the eastern end of that route faster than anyone is building an alternative to its western end. That is the central fact for anyone planning around these corridors, and it cuts against the idea that sanctions and politics have been steadily draining the northern route.

    The growth is running through the old route

    The ERAI portal, which tracks rail container traffic across the broad-gauge network, reported that China–Europe–China rail container volume rose 28 per cent year on year in January–May 2026. Its update named the Central Eurasian Corridor as the route with the largest growth, at 27 per cent, and recorded a 47 per cent month-on-month jump there in May. ERAI does not define the corridor in that update, but its index covers the routes from the Dostyk and Altynkol crossings on the China–Kazakhstan border to Brest and Kaliningrad. In plain terms, this is the transit route through Russia and Belarus.

    The two growth figures do not quite fit together, since a corridor growing at 27 per cent cannot have the highest relative growth within an aggregate growing at 28 per cent, unless rounding or a different base period is involved. The direction of travel is not in doubt, though: volumes on the route through Russia and Belarus rose sharply, not slightly.

    Sea freight explains much of this. Bloomberg, as reported by The Astana Times in May, linked the shift to instability around the Strait of Hormuz. Talgat Aldybergenov, chief executive of Kazakhstan Temir Zholy, said Chinese clients had become more interested in land routes "because of reliability and predictable delivery times". ERAI’s June update put the Shanghai–Rotterdam container rate at $4,342 per FEU on 18 June, after a sharp climb, and cited uncertainty over the Middle East conflict as one driver. Rail stayed dearer. ERAI put China–Europe rail at about $10,000 per FEU at the start of June, a rise of $300–600 on May. Rail is winning on predictability, not price.

    Kazakhstan is widening the eastern gates

    Kazakhstan’s transport ministry reported 18.7 million tonnes of rail freight between Kazakhstan and China in the first half of 2026, up 9 per cent. The split by crossing matters. Dostyk handled 10.6 million tonnes, up 15 per cent. Altynkol handled 8.1 million tonnes, up 2 per cent. Growth has gathered at Dostyk, where the second track on the Dostyk–Moiynty line opened in September 2025. President Tokayev called it the largest railway line built since independence and said it would increase freight volumes fivefold.

    More is coming. In July, Vice Minister of Transport Zhanibek Taizhanov told The Times of Central Asia that the Moyynty–Kyzylzhar and Darbaza–Maktaaral lines should enter service by the end of 2026, and that Bakhty–Ayagoz, which adds a third rail crossing to China, should follow by the end of 2027. Bloomberg reported plans for $10 billion of transport investment through 2030, 900 kilometres of new line in 2026, and rail capacity between China and Europe rising from about 55 million to 100 million tonnes a year by 2030. That last figure is a target, and the reporting does not say how it is measured.

    Most of this capacity feeds the same western exit. More track from the Chinese border does not create a route that avoids Russia and Belarus. It allows more trains to reach them. The exception is traffic sent across the Caspian, which has its own constraints, chiefly that far more containers travel west than come back east.

    The Kyrgyz alternative is years away and small

    The China–Kyrgyzstan–Uzbekistan railway is the one new line that would give China a southern rail exit through Central Asia without crossing Kazakhstan or Russia. It is now under construction. As of July, according to The Diplomat, the planned 530 km route included about 304 km through Kyrgyzstan’s Tien Shan, with 50 bridges and 29 tunnels totalling 104.83 km. Three of those tunnels are each over 12 km long. Around 5,000 people were working on the line, and officials aimed to have 5 per cent of it built by the end of 2026.

    The financing is set. A joint project company is 51 per cent Chinese and 24.5 per cent each Kyrgyz and Uzbek. The Diplomat put the value at $4.7 billion for the Kyrgyz section, with China lending $2.35 billion. Kyrgyzstan will pay half of its share from the state budget and borrow the other half from China, a further $305 million over 25 years. In November 2025, the head of Uzbekistan’s railways said the line could be finished two years before the planned 2030 date. Even then, the feasibility study projects initial freight of 5–8 million tonnes a year, rising to 13–15 million tonnes over the long run. The line also involves a gauge change at Makmal, where standard gauge from China meets the 1,520 mm network. It is a real project, but a slow one. It will ease dependence on the northern route at the margin before the end of the decade, not replace it.

    One crossing carries the corridor

    At the western end, the risk is concentrated in one place. In September 2025, Poland closed its border with Belarus for 13 days, citing joint Russian–Belarusian military exercises and a drone incursion. Yicai reported that more than 130 China–Europe trains were stranded at Brest, and transit times from China to Małaszewicze rose from two to four days to 20 days. The border reopened on 25 September, but it took about a week to clear the backlog at Brest.

    How much traffic this crossing carries depends on the source. UIRR, the European combined-transport association, set out the range at the time. Politico put the Małaszewicze share at 90 per cent, while ERAI data gave 84.7 per cent, or 280,200 TEU. Estimates of the value of overland China–EU trade ranged from €25.07 billion (Upply) to €56.7 billion (Chinese sources). The gap reflects different measures: trains against containers, and declared value against estimated value. Even the lower share means that most of the route passes through a single pair of border stations that one EU government has already shown it will close.

    What the numbers do not show

    They do not show that the northern route has become safer. Growth in 2026 is a response to trouble at sea, not a vote of confidence in overland politics. They do not show how much of the traffic is transit to Europe rather than trade with Russia or Central Asia. The ERAI aggregate combines both directions, and Kazakhstan’s tonnage figures mix bulk exports with containers. They also do not show whether the Chinese-border capacity now being built will be matched by capacity at Brest and Małaszewicze. No source we reviewed gives a figure for that.

    What to watch

    Three things will show whether this pattern holds. First, whether rail volumes stay high once sea rates fall back. If they do, the shift is structural. If they do not, 2026 was a detour. Second, whether Poland treats the Belarus crossings as a lever again. The 2025 closure showed that Warsaw is prepared to impose the cost, and that most of it falls on shippers using the route. Third, whether the Kyrgyz tunnelling keeps to schedule through 2027. That is the earliest point at which a southern exit becomes a planning assumption rather than a hope. Until then, Kazakhstan’s investment is making the route wider without making it any less dependent on Russia, Belarus and one Polish border crossing.

    Sources

    Related publications

    Reports · Europe

    Hungary Signs Sweeping China Strategic Partnership Covering 5G, EV Batteries, and BYD Expansion

    Hungarian Prime Minister Viktor Orbán signed a comprehensive strategic partnership with China during a state visit to Beijing on 21 October 2026, covering 5G telecommunications infrastructure deployment, expanded electric vehicle battery manufacturing, and a significant extension of BYD's Debrecen factory programme. The European Commission has formally requested details of the state aid provisions attached to the BYD expansion, and several EU member states have raised concerns about the 5G infrastructure element under the EU Toolbox for 5G Security framework.

    Reports · China & Asia-Pacific

    India Uses BRICS Co-Chairmanship to Push Multipolar Agenda on Trade and Development Finance

    India, assuming the BRICS co-chairmanship alongside Russia in the October 2026 session, advanced a reformed agenda focused on development finance, digital public infrastructure, and trade settlement in local currencies, deliberately steering discussions away from anti-Western framing. New Delhi's approach reflects a strategic bet that a more pragmatically focused BRICS can deepen Indian influence across the Global South without triggering Western counter-balancing. A joint statement endorsed the New Development Bank's expanded lending mandate.

    Reports · China & Asia-Pacific

    China's Belt and Road Initiative Ten-Year Review Shows Central Asia Gains, Mixed Outcomes Elsewhere

    China's National Development and Reform Commission released a comprehensive ten-year review of Belt and Road Initiative project outcomes on October 18, covering 147 countries and 3,100 projects. The review acknowledges debt sustainability concerns in 23 participating countries, confirms a strategic reorientation toward Central Asia and the Middle East, and announces a new BRI 3.0 framework emphasising green energy, digital infrastructure, and private investment co-financing. Central Asian countries are identified as the highest-performing BRI recipients by economic return indicators.